infrastructure
Our Infrastructure
Our company boasts a robust and evolving infrastructure, developed to support high-quality casting, fabrication, and precision engineering. Spread across two state-of-the-art units, our facilities are strategically designed for seamless production and scalability.
Unit 1 – Established 2005
Founded in 2005 on a 1500 sq. meter land parcel, Unit 1 laid the foundation for our manufacturing operations. The initial setup included a 500 kg induction furnace, which was later complemented by a 1000 kg induction furnace in 2010 to enhance production capabilities. To support machining and finishing, a machine shop and a perforated sheet manufacturing unit were added in 2011.
Key Features:
500 kg and 1000 kg induction furnaces
Advanced machine shop for post-casting operations
Dedicated perforated sheet production line
On-site material handling and storage
Unit 2 – Commissioned 2022
Unit 2, our newly established foundry operational since 2022, spans a larger area and is equipped with enhanced capacity and upgraded technologies. With a production capacity exceeding 500 tons per month, this facility is tailored to meet increasing client demands and international standards.
Key Features:
Modern melting and pouring bays
Automated molding and core-making equipment
Precision control systems for metallurgical consistency
Quality control and material testing laboratory










